Running a Steering Committee can feel like navigating a minefield. People attend because they should, not because they need to make a decision. A poorly structured committee devolves into an hour of people reading out Jira tickets, which wastes senior stakeholder time and stalls genuine progress.
Optimising these sessions requires shifting focus from reporting to deciding. Consider this advice applicable whether your technical group meets in person or you are coordinating globally across different time zones.
First, nail down governance boundaries. Similar to major international projects, clear delineation of roles matters. Who is the Programme Steering Committee (PSC) for high-level strategic oversight? Who constitutes the working Project Management Unit (PMU) that drafts materials? These groups must know their boundaries; otherwise, every minor issue becomes a governance debate.
Second, mandate pre-reading. Never use the committee slot to present data that could be read beforehand. Send out a concise pre-read digest (no more than 5 pages) detailing 2-3 precise decisions required. For instance, instead of presenting the entire risk register, present the top three accepted risks and force a decision on mitigation funding.
Remembering the trade-off here: demanding high preparation risks appearing overly bureaucratic. However, the alternative—wasting C-suite attention spans—is far costlier. For remote teams, supplement mandatory documentation with a short, structured pre-meeting poll on the collaboration tool (e.g., Yammer or Teams Forms) to gauge sentiment before the call even begins. This guarantees you arrive with information, not just anecdotes.
Takeaways
- Shift Focus: Steering Committees must aim for strategic decisions, not reactive status updates.
- Define Roles: Clearly separate the oversight body (PSC) from the executing working group (PMU).
- Mandate Pre-Reads: Supply concise documentation ahead of time, reserving meeting time only for debate and sign-off.
- Tool Hack: Use async polling tools before the meeting to gather initial sentiment data from distributed members.
Resources
- Best practices for managing stakeholders and governance structures (Reviewing stakeholder roles)
- Project management governance frameworks (For structure definition)
Modern Project Management for Distributed Teams
PM Squared shares practical tools, templates, and lessons for PMs navigating remote work in 2026.
Browse Resources →